Enhance Your Career With Available Preparation Guide for AACE-PSP Exam [Q17-Q33]

4/5 - (4 votes)

Enhance Your Career With Available Preparation Guide for AACE-PSP Exam

Get Special Discount Offer of AACE-PSP Certification Exam Sample Questions and Answers

AACE-PSP certification program is designed to recognize and validate professionals’ expertise in project planning and scheduling. Planning & Scheduling Professional (PSP) Exam certification program covers the fundamental principles of planning and scheduling, including project planning, scheduling, monitoring, and control. The AACE-PSP certification program is globally recognized and is highly valued by employers worldwide.

 

NO.17 The linear scheduling velocity diagram has the following two-axis:

 
 
 
 

NO.18 For the late finish for Activity 11001, select the most appropriate response for transitioning from the forward pass.

 
 
 
 

NO.19 Which of the following phases does NOT describe the commonly accepted construction life cycle?

 
 
 
 

NO.20 Each column must be poured in one day. Each column requires 2,000 cubic feet of concrete. The lift bucket has a capacity of 40 cubic feet. How many lifts will be required per column pour?

 
 
 
 

NO.21 What is the remaining work duration of Active D?

 
 
 
 

NO.22 Who can define KPls?

 
 
 
 

NO.23 Assuming that you had only one crane capable of 30 lifts per day, 3 column pours requiring 28 lifts each, plus associated assorted work requiring an additional 150 lifts, what is the minimum planned working duration for this work?

 
 
 
 

NO.24 Using the “normal” schedule, what is the early finish date of activity 10002 and its total float?

 
 
 
 

NO.25 Why does activity 11001 not show successor activities?

 
 
 
 

NO.26 Estimate to complete (ETC) is __________________.

 
 
 
 

NO.27 These are the activities on the critical path:

 
 
 
 

NO.28 The characteristic of the precedence diagramming method that models construction projects differently than the arrow diagramming method is that it____________.

 
 
 
 

NO.29 Determine the correct formula and date for the late finish for Activity 9004.

 
 
 
 

NO.30 Time-scaled logic diagrams are

 
 
 
 

NO.31 Each column must be poured in one day. Each column requires 2,000 cubic feet of concrete. The lift bucket has a capacity of 40 cubic feet. How many lifts will be required per column pour?

 
 
 
 

NO.32 What is the workweek period for this project?

 
 
 
 

NO.33 In the “normal” schedule, excluding Activity 1000, what activity(s) are concurrent with Activity 3001?

 
 
 
 

Updated AACE-PSP Dumps Questions Are Available For Passing AACE International Exam: https://www.real4exams.com/AACE-PSP_braindumps.html

         

Related Links: www.stes.tyc.edu.tw myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below