CTAL-TAE Braindumps Real Exam Updated on May 12, 2022 with 41 Questions [Q16-Q40]

Rate this post

CTAL-TAE Braindumps Real Exam Updated on May 12, 2022 with 41 Questions

Latest CTAL-TAE PDF Dumps & Real Tests Free Updated Today

NEW QUESTION 16
As a TAE you are evaluating a functional test automation tool that will be for several projects within your organization. The projects require that tool to work effectively and efficiently with SUT’s in distributed environments. The test automated tool also needs to interface with other existing test tools (test management tool and defect tracking tool.) The existing test tools subject to planned updates and their interface to the test automated tool may not work property after these updates.
Which of the following are the two LEAST important concerns related to the evaluation of the test automation in this scenario?
* Is the test automation tool able to launch processors and execute test cases on multiple machines in different environments?
* Does the test automation tool support a licensing scheme thatallows accessing different sets?
* Does the test automation tool have a large featureset, but only part of the features will be sets?
* Do the release notes for the planned updates on existing specify the impacts on their interfaces to other tools?
Does the test automation tool need to install specific libraries that could impact the SUT?

 
 
 
 

NEW QUESTION 17
You have been asked to determine a TAS for a new release of a SUT,test should be automated wherever. The new release will consist of 5 new interfaces and an amendment to 3 existing interfaces. The new and amended interface will be deliver incrementally in 3 sprints, each lasting 2 weeks.
What would be the BEST Test Automation Solution (TAS) design in this scenario?

 
 
 
 

NEW QUESTION 18
The GUI of a Customer Relationship Management (CRM) application has been delivered through internet Explorer with proprietary Active X and Java controls. This implementation enables rich client capabilities, but specific commercial automation tools are necessary to automate test cases at GUI of functional test cases. This is to demonstrate whether a small set of the commercial are able to properly recognize actions taken by a tester when interacting with GUI of the CRM application.
Which of the following scripting techniques would be MOST suitable in this scenario?

 
 
 
 

NEW QUESTION 19
You are currently designing the TAA of a TAS. You have been asked to adopt an approach for automatically generating and executing test cases from a model that defines the SUT. The SUT is a state-based and event-driven that is described by a finite-state machine and exposes its functionality via an API. The behavior of the SUT depends on hardware and communication links that can be unreliable.
Which of the following aspects is MOST important when designing the TAA in this scenario?

 
 
 
 

NEW QUESTION 20
Which of the following statements BEST describe aspects of the SUT to consider when designing a TAA?

 
 
 
 

NEW QUESTION 21
Consider the following layers of the gTAA structure:
a.Test generation layer
b.Test definition layer
c.Test execution layer
d.Test execution layer
Consider the following capabilities associated with these layers.
Acquire all the necessary resources before each test and release all after run, in order to avoid interdependences between test Allow the automated test scripts on an abstract level to interact with components, configurations and interfaces of the SUT.
Design test directives that allow configuring the algorithms used to automatically produce the test cases a given model of the SUT.
Allow the definition and implementation of test cases and data by means of templates and/or guidelines.
Which of the following BEST matches each layer with the appropriate capability?

 
 
 
 

NEW QUESTION 22
You are reviewing the testability of your SUT.
Which of the following BEST refers to the characteristic of OBSERVABILITY?

 
 
 
 

NEW QUESTION 23
Consider the following example of TAS metrics.
Time to execute automated tests
Speed and efficiency of TAS components
Which of the following statements is TRUE?

 
 
 
 

NEW QUESTION 24
What is NOT a factor in considering when you are asked to ensure an effective transition from manual to automated tests?

 
 
 
 

NEW QUESTION 25
Which of the following success factors for a test automation project is TRUE?

 
 
 
 

NEW QUESTION 26
Youare using a gTAA to create a TAS for a project. The TAS is aimed specifically at automating a suit of existing manual test cases for standalone desktop applications. All the interfaces between the TAS and SUT will be from the CUI of the application.
Whichof the following layers of the gTAA should you focus on for the TAS?

 
 
 
 

NEW QUESTION 27
Consider a TAS that is going to be deployed for the first time. The TAS requires share resources and run it its own test environment. The infrastructure for the TAS has been created along with maintenance procedures. It is very unlikely the TAS will be required to work in other target Environments. There is a high-risk that when the TAS is deployed in its own test environment, a number of existing application will no longer work because of conflicts with the existing shared resources.
Which of the following activities would you expect to be MOST effective at mitigating the risk associated with the first deployment of the TAS?

 
 
 
 

NEW QUESTION 28
Consider a TAS that exclusively uses the APIs of a SUT. To make this work, significant changes have been required to the SUT by adding a set of dedicated test interfaces to the APIs. All the automated tests will use these test interfaces when interacting with the SUT. Assume that you are currently verifying the correctness of the automated test environment and test tool setup.
Which of the following would you expect to be the MOST specific risk associated with this scenario?

 
 
 
 

NEW QUESTION 29
You are using a gTAA to create a TAS for a project. The TAS is aimed at automatically and executing test cases based on a use-case Modeling approaching that uses UML as a modeling language. All the interaction between TAS and SUT will only be at the API and GUI level.
Which of the following components of the gTAA would you EXCLUDE from the TAS?

 
 
 
 

NEW QUESTION 30
Which of the following is NOT an advantage of test automation?

 
 
 
 

NEW QUESTION 31
Which of the following statements about the reuse of TAS artefacts is TRUE?

 
 
 
 

NEW QUESTION 32
Consider thefollowing example of TAS metrics.
Time to execute automated tests
Speed and efficiency of TAS components
Which of the following statements is TRUE?

 
 
 
 

NEW QUESTION 33
Which of the following attributes should NOT be included in a test execution report associated with a suite of automated tests?

 
 
 
 

NEW QUESTION 34
A web application was released into production one year ago, it has regular release which follow a V-model lifecycle and testing is well-established and fully integration into the development lifecycle. You have beenasked to implement a TAS for the regression test suite. The regression tests have been developed via the GUI and are expected to be run at least four times a month, for each planned release, for the whole operation solution life of the system (six years). Each screen of the GUI uses several third-party controls which are not compatible with the existing automation solutions. The environment for the automation will be stable, fully controllable and separated from other environments (development, staging, production).
What could be the MOST problematic for this TAS?

 
 
 
 

NEW QUESTION 35
A defect in a SUT has been resolved and validated by an automated defect re-test in the current release of the software. This retest has now been addedto the automated regression test suite.
Which statement BEST describes a reason why this defect could re-occur in future releases?

 
 
 
 

NEW QUESTION 36
You are working on a TAS forstandaloneapplication. The automated tests are developed based on a automation framework that allows interaction with GUI elements using on object orientated API. The GUI elements includemenus, buttons, radio buttons, text toolbars and their properties.
Whilst automating a test, you have discovered that the GUI elements of some third party components are not identifiable by the automated tool you are using.
Which of the following is the FIRST step that you take to investigate this issue?

 
 
 
 

NEW QUESTION 37
Which of thefollowingstatementsdoes NOT describe good practice for maintaining the TAS?

 
 
 
 

NEW QUESTION 38
Consider a TAS associated to dynamically changing software frequent releases. Your goal is todetermine the amount of effort required to maintain the automated tests of the regression test suite for each new release of the SUT.
What is the MOST important metric to collect to achieve your goal?

 
 
 
 

NEW QUESTION 39
Which of the following metrics could suggest, under certain condition that an automated regression test suite has NOT been updated for new functionalities added to the SUT?

 
 
 
 

NEW QUESTION 40
Consider A TAS for testing a desktop application via its GUI. All the test cases of the automated test suite contain the same identical sequences of steps at the beginning (to create the necessary objects when doing a preliminary configuration of the test environment and at the end (to remove everything created -specifically for the test itself during the preliminary configuration of the test environment). All automated test cases use the same set of assertion functions from a shared library, for verifying the values in the GUI fields (e.g text boxes).
What is the BEST recommendation for improving the TAS?

 
 
 
 

ISQI CTAL-TAE Exam Syllabus Topics:

Topic Details
Topic 1
  • Relate test cases to test objectives or SUT requirements
  • Configure and parameterize the test setup
Topic 2
  • Analyze the SUT responses during test executionto steer subsequent test runs
  • Understanddesign considerations for a TAA
Topic 3
  • Understand “design for testability” and “design for test automation” methodsapplicable to the SUT
  • Analyze a system under test to determine theappropriateautomation solution
Topic 4
  • Explain the factors to be considered when identifyingreusability of components
  • Interpret both test data and test cases and transform them into executable scripts
Topic 5
  • Ability to trace the generated tests back to the model
  • Explaintherole that layers play within a TAA
Topic 6
  • Defining test scripts for the execution of the test case
  • Set up and tear down test suites
Topic 7
  • Set up and tear down the SUT for test execution
  • Design the appropriateTAAfor a given project
Topic 8
  • Developing, capturing, or deriving test data
  • Providing access to test libraries as needed

 

CTAL-TAE Dumps With 100% Verified Q&As – Pass Guarantee or Full Refund: https://www.real4exams.com/CTAL-TAE_braindumps.html

         

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt blogfreely.net myportal.utt.edu.tt www.stes.tyc.edu.tw

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below